Discovery
We record product samples, data or drawings, your current process flow, target capacity, quality criteria and site requirements.
Approach
At the start of every project, we agree in writing on the product data, target cycle time, process and quality criteria, site conditions and how the machine will be accepted.

We record product samples, data or drawings, your current process flow, target capacity, quality criteria and site requirements.
Layout, mechanical and electromechanical design, electrical and electronic design, safety devices and circuits, the control sequence, and access and maintenance for each assembly go through internal review and then to you for approval.
We manufacture every part, fixture, welded frame and sheet-metal component to the approved drawings and revisions, and build the electrical panels and any special panel equipment. Mechanical and electrical assembly follows the 3D model, bill of materials and assembly instructions.
With the software written around the process sequence, we test cycles and recipes, verify the safety functions and check data recording.
We run the full process, checking and testing station by station. For production machines, we measure finished parts and validate the process; for test machines, we check and approve the test results. Once the factory acceptance items are complete and you have approved them, the machine ships. After installation on site, we complete the site acceptance items and hand the machine over.
We provide warranty service, remote and on-site troubleshooting and spare parts. When your process changes, we handle software or mechanical modifications within the contract and service scope.
How We Decide
Product, capacity, quality, site, budget and schedule constraints shape the quote and the design.
Design reviews check how each part will be made, the assembly sequence, adjustment points, guarding and maintenance access.
Measurement method, test recipe, acceptance tolerances, reject handling and record format are set during design.
The project scope sets out FAT, SAT, training, the data you will receive, critical spares and service responsibilities.
Project Records
We log every mechanical, electrical and software change and tell you how it affects schedule and cost before you approve it.
Cycle time, quality limits, product variants and customer responsibilities are tied to written acceptance criteria.
FAT and SAT results, open items, training attendance and customer approvals are recorded.
You receive the agreed data, manuals, maintenance instructions and spare-parts lists, as set out in the contract.